Calgary Road Closures and Lane Resitrictions - Sept, 2013

Southeast
Eastbound 12 Avenue S.E. will be reduced to one lane east of Macleod Trail S.E. from Friday, September 27 at 7 p.m., until Monday, September 30 at 5 a.m. for utility work. Major delays are expected.

Two left lanes will be closed on northbound Macleod Trail between 7 Avenue S.E. and 10 Avenue S.E. from 8 a.m. Saturday, September 28 to 9 p.m. Sunday, September 29  for utility repairs.
There will be a single left lane closure on westbound Seton Boulevard S.E. at Seton Way S.E. on Saturday, September 28 from 7 a.m. to 5 p.m. for utility work. The eastbound left turn bay will also be closed during this time.
 40 Street S.E. will be closed between 61 Avenue S.E. and 64 Avenue S.E. from 7 a.m. Saturday, September 28 to 7 p.m. Sunday, September 29 for utility work. Traffic will be detoured to 36 Street S.E. and 44 Street S.E. Local business access will be maintained.
42 Avenue S.E. will be closed between 9 Street S.E. and 11 Street S.E. from 7 a.m. Saturday, September 28 to 7 p.m. Sunday, September 29 for utility work. Westbound traffic will be detoured to 34 Avenue S.E. and eastbound traffic will be detoured to 44 Avenue S.E.  Local business access will be maintained.
42 Avenue S.E. will be closed between 1 Street S.E. and the 39 Avenue S.E. from 6 a.m. Saturday, September 28 to 10 p.m. Sunday, September 29 for CPR rail repairs.  Calgary Transit LRT tracks will be unaffected. Local business access will be maintained. Drivers are encouraged to use alternate routes such as 58 Avenue S.E.
There will be various lane closures on 46 Avenue S.E. from Blackfoot Trail to 12 Street S.E. from 4 a.m. to 6 p.m. on Sunday, September 29 for paving.
Northbound Macleod Trail S.E. will be reduced to two lanes at 25 Avenue S.E. on Sunday, September 29 from 7 a.m. to 5 p.m. for paving.
Two right lanes will be closed on northbound Macleod Trail S.E. at 7 Avenue S.E. at 6 a.m. until 12 noon on Saturday, September 28 for public art installations.
There will be various closures on 6 Avenue S.E. between 1 Street S.E. and Centre Street from 6 a.m. to 8 p.m. daily on Saturday, September 28 and Sunday, September 29 for roadwork.
Southwest
33 Avenue S.W. will be closed between 17 Street S.W. and 18 Street S.W. from 6 p.m. on Friday, September 27 until 7 p.m. on Saturday, September 28 for utility work.

21 Avenue S.W. will be closed east of 4 Street S.W. from 7 a.m. to 2 p.m. on Saturday, September 28 for maintenance work.

17 Avenue S.W. will be reduced to two lanes in each direction at 33 Street S.W. from 9 a.m. to 3 p.m. on Monday, September 30 and Tuesday, October 1 for road construction.
Two right lanes will be closed on 11 Street S.W. at 7 Avenue S.W. on Saturday, September 28 and Sunday, September 29 from 6 a.m. to 12 noon daily for public art installations.
10 Street S.W. will be closed at 7 Avenue S.W. on Saturday September 28 and Sunday September 29 from 12 noon to 10 p.m. daily for public art installations.
There will be various lane closures on Centre Street South between 7 Avenue and 5 Avenue on Saturday, September 28 and Sunday, September 29 from 6 a.m. to 8 p.m. daily for roadwork.
Westbound Bow Trail will be reduced to one lane between 10 Avenue S.W. and Crowchild Trail on Saturday, September 28 from 7 a.m. to 3 p.m. for West LRT landscaping.
Eastbound 9 Avenue S.W. will be reduced to one lane over 14 Street S.W. on Saturday, September 28 from 7 a.m. to 3 p.m. for bridge construction.
10 Avenue S.W. will be closed between 4 Street S.W. and 5 Street S.W. on Sunday, September 29 from 6 a.m. to 6 p.m. for hoisting operations.
Northbound Sarcee Trail will be reduced to one lane between 17 Avenue S.W. and Bow Trail from 9 a.m. to 3 p.m. on Monday, September 30 for West LRT landscaping.
Northwest
14 Avenue N.W. will have alternating lane closures between 16 Street N.W. and 19 Street N.W. from 10 p.m. on Friday, September 27 until noon on Saturday, September 28 for LRT maintenance.

There will be alternating lane closures in both directions on Shaganappi Trail, between John Laurie Boulevard and Dalhousie Drive from Monday, September 30 until Wednesday, October 2 for paving preparation.

Special events
The left lane is closed on northbound Macleod Trail S.E. between 8 Avenue S.E. and 7 Avenue S.E. until midnight on Friday, September 27 for the Alberta Culture Days 2013 Kick Off.

Alberta Transportation closures

For more information visit Alberta Transportation’s website or call 511.